Skip to content
60m² · Medium — two cars

60m² resin driveway cost

£2,400 to £7,200 on published UK cost-guide rates — two cars with turning space, typically about 6m wide by 10m deep, or an L-shape round the side of a house.

Why this size, specifically

The best-evidenced size on this site: two current 2026 guides publish a 60m² figure directly, and for once they broadly agree. MyBuilder says £2,400 to £4,200, MyJobQuote says £3,500 to £5,500. The overlap, £3,500 to £4,200, is about as close to a defensible UK number as published data gets.

The labour split is published for this size

MyJobQuote breaks 60m² down as £2,400 to £3,800 of materials and £1,100 to £1,700 of labour over two to three days, at a day rate of £300 to £500. That is a useful sanity check: if a quote has labour at a third of the total, it is in line with the published split.

Irregular shapes cost more than the area suggests

Checkatrade notes that larger or irregularly shaped areas need more materials and labour time. A 60m² L-shape round the side of a house has far more edge per m² than a 60m² rectangle, and edging is charged by the metre.

Laying speed sets the day count

Checkatrade states resin must be laid at about 20 metres per hour for the mix to go down properly. That is a physical constraint, not a padding exercise — a crew that promises 60m² finished in a morning is cutting something.

Groundwork and extras

These are the lines that decide whether a resin drive costs £2,000 or £6,000. Only MyBuilder itemises them; the other guides fold them into the per-m² rate or leave them out entirely.

ItemPublished costSourceWhat drives it
Excavate and remove the existing surface £10 – £20 per m² MyBuilder Varies with site conditions and how easily a machine and a grab lorry can reach the drive.
New Type 1 MOT sub-base £15 – £30 per m² MyBuilder Needed whenever the existing base is broken up, or there was never one. Resin laid on a bad base fails at the edges first.
Removing an existing resin driveway £800 – £1,800 whole job MyJobQuote Quoted as a whole-job figure rather than per m².
Edging or borders £15 – £40 per linear metre MyBuilder Resin bound has to be laid up to a firm edge. With walls or an existing kerb you may need none of this; an open drive needs it all the way round.
Drainage improvement £300 – £1,000 whole job MyBuilder Only needed where the ground does not take water away on its own.
Soakaway installation £660 – £1,200 whole job MyJobQuote MyJobQuote puts a typical soakaway at around £850, smaller systems from £660 and larger ones at £1,000–£1,200. HomeHow gives £700–£1,000 for the same job. Most likely on clay ground, or when laying over a non-permeable base.
Dropped kerb £370 – £2,000 whole job HomeHow The widest disagreement of any figure on this site. HomeHow says the work starts from £300 plus a £70–£100 council application; MyJobQuote puts the average at around £2,000. It is council-dependent, and it is a separate job from the driveway.

Where these prices come from

Four published UK cost guides. We read them on 27 September 2026, recorded what each one says, and cite them per figure rather than blending them into an average that belongs to nobody.

Checkatrade
How much does a resin bound driveway cost in 2026?
Guide updated:
Cost tables dated April–June 2026; page dated 02/2026
Read by us:
2026-09-27
Read the guide →
MyJobQuote
Resin Driveway Cost: How Much is a Resin Driveway? (UK 2026)
Guide updated:
26 August 2026
Read by us:
2026-09-27
Read the guide →
MyBuilder
Resin Driveway Cost Guide in the UK
Guide updated:
21 August 2026
Read by us:
2026-09-27
Read the guide →
HomeHow
Resin Driveway Cost: How Much Is Resin Driveway? [UK Guide]
Guide updated:
29 August 2025
Read by us:
2026-09-27
Read the guide →

Get quotes for a 60m² drive

Published figures tell you the range. Only an installer who has stood on your drive can tell you the number.

Get resin driveway quotes

Tell us the drive and where you are. Your details go to installers who cover your postcode — we publish costs, we do not lay driveways, and nobody gets your number until you send this.

  • We are a cost guide, not an installer — so we have nothing to gain from talking the price up.
  • Your postcode decides who hears about it. No postcode, no route.
  • Three quotes is the standard advice, because the same job varies 20 to 30 per cent between firms.
  • No number is a quote until someone has stood on your drive.

Estimates on this site are arithmetic on published cost-guide rates. They are not quotes, not offers, and not based on seeing your property.